On May 8, from 9 a.m. -1 p.m., traffic lanes will be shifted to the northerly side of Newport Way NW between Pine Cone Dr and Anthology Way to allow work crews to grind and overlay a small patch of roadway. Two way traffic will be maintained the entire time during this work.